Permian guide · Updated 2026-11-20
Workforce Housing Rentals for a Moving Permian Pipeline Spread
Pipeline spreads move every week. This guide covers how to choose camp yards and phase units so housing keeps up.

Key points
- Pick yards along the route, not at one end.
- Phase units so one camp stays open while the next is built.
- EIA publishes drilling data for the Permian.
A pipeline crew can move miles in a week. A single camp at one end of the route becomes a long commute by the middle of the job.
Yards along the route
For a route through Crane, McCamey, and Iraan, plan a camp yard near each third of the line and move units as the spread advances.
Phasing
Keep the current camp open while the next one is set. Every move needs road planning; check TxDOT for permits on oversize loads.
Context
The U.S. EIA publishes drilling data for the Permian, and the Railroad Commission regulates the industry in Texas.
Sources
- U.S. EIA: Drilling Productivity Report: Federal data on drilling activity by region, including the Permian.
- Railroad Commission of Texas: Oil & Gas Division: The state agency division that regulates oil and gas activity in Texas.
- Texas Department of Transportation: Road conditions, closures, and oversize-load permits.
Links checked 2026-11-20. Figures quoted above appear on the linked pages.